Login or Register for free!


Infrosoft 

Icon Home > Articles > Infrosoft Health > Air (Prevention and Control of Pollution) Rules, 1983 (2)
Hi Guest
Username
Password
Air (Prevention and Control of Pollution) Rules, 1983 (2)
Date 19/10/11/11/32  Author Infrosoft Health Content Team  Hits 972  Language Global
G.S.R. 6(E).-In exercise of the powers conferred by section 54 of the Air (Prevention and Control of Pollution) Act, 1981 (14 of 1981), the Central Government, in consultation with the Central Board for the Prevention and Control of Water Pollution, hereby makes the following rules, namely:-

21. Repeal and saving.

All rules corresponding to these rules and in force in a Union territory immediately before the commencement of these rules are hereby repealed:

Provided that any order made or action taken under the rules so repealed shall be deemed to have been made or taken under the corresponding provision of these rules.

[No. Q-16011/1/83-EPC (II)]
 G. SUBA RAO, Jt. Secy.

3[FORM I
(See rule 9)

Application for Consent for emission/continuation of emission under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981.

From


To

The Member Secretary,
Central Pollution Control Board,

Sir,

I/We hereby apply for CONSENT/RENEWAL OF CONSENT under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 (14 of 1981) to bring into use a new/altered *stack for the discharge of emission/to begin to make new discharge of emission/to continue to discharge emission* from stack in industry owned by .................................

FOR OFFICE USE ONLY

1

Code No.

 

2

Whether the unit is situated in a critically polluted area as identified by Ministry of Environment & Forests

 

 

TO BE FILLED N BY APPLICANT

PART A GENERAL

3

(a)

Name of Owner/Occupier

 

 

(b)

Name and address of the unit and location

 

4

(a)

Whether the unit is generating hazardous waste as defined in the Hazardous Wastes (Management and Handling) Rules, 1989

 

 

(b)

If so the category No.

 

5

(a)

Total capital invested on the project

 

 

(b)

Year of commencement of production

 

 

(c)

Whether the industry works general/2 shifts/round the clock

 

6

(a)

List and quantum of products and bye-products

 

 

(b)

List and quantum of raw materials used

 

7

Furnish a flow diagram of manufacturing process showing input and output in terms of products and waste generated including for captive power generation and demineralised water

 

PART B-Pertaining to sewage and trade effluent

8

Quantity and source of water for:

 

 

(a)

Cooling m3/d

 

 

(b)

Process m3/d

 

 

(c)

Domestic use m3/d

 

 

(d)

Others m3/d

 

9

Sewage and trade effluent discharge

 

 

(a)

quantum of discharge m3/d

 

 

(b)

Is there any effluent treatment plant

 

 

(c)

If yes, a brief description of unit operations with capacity

 

 

There are no comments.

Browse Corporate Join In Elsewhere  
Home About Us Sign Up   Twitter
Search   

Health Topics Advertise with Us Blogs   facebook
Healthy Living Careers Forum  You Tube  
Health Centres Contact Us   Site Map RSS Feeds Designed & Maintained by : Student Superstars
Health Tools   Newsletter  Digg Hosted & Technical Support by : Infrosoft Technologies Pvt Ltd
Services     Delicious  Updated on: 05 May, 2017
         
         
Disclaimer : The content of the site are for informational purposes only.  Always seek the advice of a qualified physician for any doubt.

Infrosoft Copyright   |   Privacy Policy   |   Sponsor Policy    |   Editorial Policy   |    Terms of Use       ©   All Rights Reserved 2010 - 2017
         


MemHT Portal is a free software released under the GNU/GPL License by Miltenovik Manojlo